1单选题1 / 40
A program can best be described as:
查看答案
C. A grouping of projects, similar in nature, which support a product or product line and have no definable end point
2单选题2 / 40
Ensuring that all work is both authorized and funded by contractual documentation is the responsibility of:
查看答案
A. The project manager
3单选题3 / 40
The project charter is a document designed to tell (    ) exactly what the project entails.
查看答案
E. Anyone associated with the project
4单选题4 / 40
Work authorization forms are needed in order to:
查看答案
D. All of the above
5单选题5 / 40
The scope baseline/project charter is prepared by the:
查看答案
E. Project manager, project sponsor and customer/user
6单选题6 / 40
Typical characteristics of a work package include:
查看答案
E. A and B only
7单选题7 / 40
Problems can occur in properly defining a project because:
查看答案
A. Project goals may not be agreeable to all parties
8单选题8 / 40
In preparing a good project definition, experienced project managers will:
查看答案
E. All of the above
9单选题9 / 40
Project life cycles provide a better means of measurement of progress and control. The four phases of a project are conceptual development, (    ), (    ), and (    ).
查看答案
C. Development, implementation, termination
10单选题10 / 40
The contractual statement of work (CSOW)
查看答案
C. Can be at a different level of detail (i.e. WBS level) than the proposal statement of work
11单选题11 / 40
Which of the following can result in misinterpretation of the statement of work?
查看答案
E. All of the above
12单选题12 / 40
A project manager believes that modifying the scope of the project may provide added value for the customer. The project manager should:
查看答案
E. Postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline
13单选题13 / 40
The document authorizing functional areas to charge against the project is the:
查看答案
A. Work authorization form
14单选题14 / 40
Going from Level 2 to Level 4 in the work breakdown structure will result in
查看答案
E. None of the above
15单选题15 / 40
Graphical displays of accumulated cost and labor hours, plotted as a function of time, are called:
查看答案
B. S curves
16单选题16 / 40
Selection criteria for project selection include:
查看答案
E. All of the above.
17单选题17 / 40
The purpose of configuration management is to:
查看答案
B. control change throughout the project
18单选题18 / 40
A work breakdown structure is most useful for:
查看答案
E. A and C.
19单选题19 / 40
A Gantt chart is useful in determining:
查看答案
B. when a task starts and stops
20单选题20 / 40
A technical requirement has which of the following characteristics:
查看答案
E. typically describe physical dimensions and performance requirements
21单选题21 / 40
The project charter is developed by:
查看答案
D. both A and C
22单选题22 / 40
A program is characterized as:
查看答案
C. a grouping of similar projects having no definite end that supports the product(s) from cradle to grave.
23单选题23 / 40
Creation of project objectives:
查看答案
E. A and B only
24单选题24 / 40
A project is defined as:
查看答案
A. a coordinated undertaking of interrelated activities directed toward a specific goal that has a finite period of performance.
25单选题25 / 40
The use of the project reports:
查看答案
E. B and C.
26单选题26 / 40
Documented work authorization provide:
查看答案
D. All of the above
27单选题27 / 40
The project life-cycle can be described as:
查看答案
A. project concept, project planning, project execution, and project close-out.
28单选题28 / 40
A Work Breakdown Structure:
查看答案
D. both A and B
29单选题29 / 40
Scope Management:
查看答案
C. is concerned with naming all activities performed, the end products which results and the resources consumed.
30单选题30 / 40
Feasibility studies occur in which life cycle phase (s)?
查看答案
A. Conceptual
31单选题31 / 40
Good project objectives must be:
查看答案
C. Realistic and attainable
32单选题32 / 40
Researching, organizing and recording pertinent information is called:
查看答案
B. Information gathering
33单选题33 / 40
The Work Breakdown Structure (WBS) is the basis for communicating:
查看答案
A. Project scope, cost control, schedule, quality
34单选题34 / 40
The sequential steps that define the process for successfully completing a project is:
查看答案
B. a life cycle
35单选题35 / 40
What is the purpose of the Project Plan?
查看答案
C. To document the Budgetary estimates.
36单选题36 / 40
Scope management is:
查看答案
E. All of the above.
37单选题37 / 40
Which percent of the total project labor hours are typically expended by the end of the second phase of the project life cycle?
查看答案
D. 25%
38单选题38 / 40
Which of the following factors has historically been the greatest contributor to project failure?
查看答案
D. Lack of management support.
39单选题39 / 40
Which of the following planning considerations is often overlooked?
查看答案
A. Planning for project termination.
40单选题40 / 40
The project stakeholders should be actively involved with the (    ) phase(s) of the life cycle.
查看答案
E. All of the above.