职业资格类项目管理师PMP美国项目管理PMP

PMP认证考试练习题(15,16)

40 题含答案PMP
共 40 题返回本类
1单选题1 / 40
things that distort, distract, or muddle the communication process are called:
查看答案
A. noise
2单选题2 / 40
which is not a consideration in a make or buy decision?
查看答案
B. competitors' method of sourcing
3单选题3 / 40
a work breakdown structure:
查看答案
D. both a and b
4单选题4 / 40
a project manager can exchange information with the project team using which media?
查看答案
E. all of the above.
5单选题5 / 40
during project execution, the customer authorizes and funds a scope change which requires a major change in the schedule. the baseline
schedule:
查看答案
C. is amended to reflect the scope change, but the original baseline is still maintained for post-project review.
6单选题6 / 40
sensitivity analysis can be used in risk analysis to:
查看答案
C. estimate the effect of change of one project variable on the overall project
7单选题7 / 40
the pareto principle is a technique used by quality managers to determine which quality control problems of a particular service or
manufacturing process should be corrected. which of the following statements represents the philosophy of the principle?
查看答案
B. the majority of defects are caused by a small percentage of the identifiable problems. improvements efforts should be reserved for these vital
few problems.
8单选题8 / 40
the budgeted cost of the work performed (bcwp) for a task that has just been completed can be calculated by:
查看答案
B. multiplying the budgeted hours to complete the task by the budgeted labor rate.
9单选题9 / 40
the project manager has, as a prime responsibility, to assure proper integration of activities. in which organizational form does the project
manager probably have the easiest time in integrating work?
查看答案
E. pure project
10单选题10 / 40
there are four methods of government procurement. which is not one of these methods?
查看答案
D. acquisition
11单选题11 / 40
a scientist is informing techs. about a new product which is starting and the type of work that the lab techs. will be expected to do. the
barriers which could hinder the lab techs. ability to filter the information include all of the following except:
查看答案
E. relative location of the lab to the scientist's office
12单选题12 / 40
many companies self insure against some risk. problems which can arise from self-insurance include:
查看答案
D. a and c
13单选题13 / 40
perhaps the biggest problem facing the project manager during integration activities within a matrix structure is:
查看答案
A. coping with employees who report to multiple bosses
14单选题14 / 40
the japanese quality control (qc) circle movement motivated its participants in many ways. which of the following represents the most
important motivation for the qc circle participants?
查看答案
A. improving the performance of the company
15单选题15 / 40
the (    ) specification delineates specific measurable capabilities or parameters for which a product can be tested as part of the
acceptance procedure.
查看答案
A. performance
16单选题16 / 40
the project life-cycle can be described as:
查看答案
A. project concept, project planning, project execution, and project close-out.
17单选题17 / 40
the salvage value of an asset is:
查看答案
D. the expected cash value at the end of an assets useful life.
18单选题18 / 40
your team has prepared a cpm schedule for your review. you notice that one node has six inputs (including two dummy activities) and four
outputs (which include one dummy activity). select the correct statement from the following:
查看答案
A. this is a valid representation if the logic is correct.
19单选题19 / 40
assume that you have a network where an activity on the critical path can be crashed by two weeks. if the activity is actually crashed by two
weeks, then:
查看答案
C. a new critical path may appear after the crash.
20单选题20 / 40
documented work authorization provide:
查看答案
D. all of the above
21单选题21 / 40
fixed-price and incentive-type contracts place responsibility for performance and financial risks associated with delay or non-performance on
the:
查看答案
C. contractor
22单选题22 / 40
in a contract, the point of total assumption refers to the point where:
查看答案
E. b and d only.
23单选题23 / 40
in a matrix organizational form, mbo may be difficult to implement:
查看答案
E. none of the above are correct answers
24单选题24 / 40
quality assurance
查看答案
B. is an auditing function that provides feedback to the project team and client about the quality of output being produced.
25单选题25 / 40
which of the following communication media is least accepted by organizations?
查看答案
C. extrasensory
26单选题26 / 40
formal written communication is mandated for which of the following?
查看答案
D. all of the above.
27单选题27 / 40
in performing an impact analysis, the most effective tool to ensure all risks are identified on large projects is the:
查看答案
A. work breakdown structure
28单选题28 / 40
in the project environment, the individual ultimately responsible for quality control is:
查看答案
D. the project manager who has ultimate responsibility for the entire project.
29单选题29 / 40
in which organizational form do project managers usually get to know the employees well enough to provide an input into their performance
review?
查看答案
C. pure project
30单选题30 / 40
the critical path in a schedule network is the path that:
查看答案
A. takes the longest time to complete
31单选题31 / 40
the use of the project reports:
查看答案
E. b and c
32单选题32 / 40
you must produce 27 widgets. you can only produce 9 widgets per production run. each production line setup costs $1000. each widget
consumes $10 worth of material and $5 worth of labor. what is the total fixed cost for producing the widgets.
查看答案
E. 1000
33单选题33 / 40
(    ) is based on information gathered and analyzed about demand and supply. this forecast provides a prediction of short and long term
prices and the underlying reasons for those trends.
查看答案
B. price forecast
34单选题34 / 40
a project is defined as:
查看答案
A. a coordinated undertaking of interrelated activities directed toward a specific goal that has a finite period of performance.
35单选题35 / 40
an acceptance control chart has limits that are based on the spec. limits for the product rather than limits which differentiate between random
and assignable causes. under which of the following circumstances should a qc manager consider this type chart
查看答案
E. a and c
36单选题36 / 40
budgeted contingencies can be detemined by:
查看答案
D. all of the above.
37单选题37 / 40
it is a generally acceptable practice that if one of your clients makes an informal request of you, then you should respond:
查看答案
C. informally
38单选题38 / 40
ouchi's theory z relates more to (    ) whereas theory x / theory y relates to (    ) .
查看答案
B. company management philosophy in treating employees; the average worker
39单选题39 / 40
the first step in building a pert/cpm network is to:
查看答案
D. create a work breakdown structure
40单选题40 / 40
which is not one of the five classifications of work found in a purchasing operafion?
查看答案
D. marketing