计算机类Oracle认证考试

PA-CO

95 题含答案Oracle认证考试
共 95 题返回本类
1多选题1 / 95
You have activated budget availability control against the overall value for an internal order and entered an overall budget of 10000.Actuals of 10000 were posted in the previous year. You are surprised to realize that a purchase order 1000 was created for this internal order in the current year. How is that possible? Note: There are 2 correct answers to this question.
查看答案
C. The cost element is exempted from budget availability control. D. The difference of 1000 is within the tolerance limits defined in the configuration.
2多选题2 / 95
Which of the following statements are applicable to automatic account assignment in SAPS/4HANA? Note:There are 2 correct answers to this question.
查看答案
C. It takes precedence over validation and substitution. D. It can be defined for postings on general ledger accounts of primary costs type.
3多选题3 / 95
What are the some of the characteristics of Profit Center Accounting in SAP S4/HANA? Note:There are 2 correct answers to this question
查看答案
B. It is integrated in the universal journal. C. It can be used with period and/or cost of sale accounting.
4单选题4 / 95
What do you need to setup in order to bring the values incoming sales orders into account based Profitability Analysis?
查看答案
D. An extension ledger of type "Prediction and Commitment"
5多选题5 / 95
Which statements are relevant to the cost of sales accounting method in profitabilitymanagement? Note:There are 2 correct answers to this question.
查看答案
A. It presents the costs and revenues information in a format that is ideal for conducting marginanalyses. D. It aims to match revenues for goods and services against sales-related expenses.
6单选题6 / 95
How do you maintain number range intervals in Controlling?
查看答案
C. By business transactions
7单选题7 / 95
You want enable WIP calculation in Product Cost by Period. What do you need to configure?
查看答案
B. Valuation variant
8多选题8 / 95
Which processes split costs into their primary cost components? Note: There are 2 correctanswers to this question.
查看答案
B. Business process price calculation D. Cost center/activity type price calculation
9多选题9 / 95
You define rules in a status profile and assign the profile to your internal order type. What doyou use the status profile for? Note: There are 3 correct answers to this question.
查看答案
A. To define the user status C. To permit or forbid specific transactions E. To set the initial status as Created or Released
10单选题10 / 95
You are implementing SAP S/4HANA and you want to run analytical reports off a single datamodel. Which statement best describes reporting in SAP S/4HANA?
查看答案
C. Reporting on data is available in real-time at every level of detail.
11单选题11 / 95
How can you populate local variables in Profitability Analysis reports?(A). (B). (C). 
查看答案
D. By user entry during report execution
12单选题12 / 95
You use a production order with Product Cost by Period and you entered a results analysiskey and variance key. How does the system calculate variances in Product Cost by Period?
查看答案
C. Variances = Actual costs - Delivery value - WIP
13多选题13 / 95
How can you configure the transfer price solution in SAP S/4HANA? Note: There are 2 correctanswers to this question.(A).(B). (C). (D). 
查看答案
C. Use separate ledgers for each valuation. D. Use separate CO versions for each valuation.
14多选题14 / 95
What are the prerequisites for automatic generation of the settlement rule to a market segment for a sales order item? Note: There are 2 correct answers to this question.
查看答案
B. Profitability Analysis (CO-PA) is activated. D. The sales order item is assigned to a project.
15多选题15 / 95
Which of the following statements best describe Product Cost by Period? Note: There are 2correct answers to this question.(A). (B). (C). D). 
查看答案
C. It is used when the focus of controlling is on a stable and continuous production process. D. It is used in conjunction with a product cost collector.
16单选题16 / 95
In the material master record there are three planned prices: ""Planned price 1"", ""Plannedprice2""and""Planned price 3"". What do you use them for?
查看答案
B. To valuate the materials in cost estimates
17单选题17 / 95
You are running an indirect activity allocation. What do you post to the sender and receiver? 
查看答案
B. You post quantity and cost to both the sender and receiver.
18多选题18 / 95
What are some of the characteristics of SAP Core Data Services (CDS) views? Note: There are3 correct answers to this question.
查看答案
B. CDS views have ready-to-use content. D. CDS views have no latency. E. CDS views support authorization.
19多选题19 / 95
You are setting up a direct internal activity allocation in SAP S4/HANA. What is valid receiversfor the activity? Note: There are 3 correct answers to this question.
查看答案
B. WBS element C. Sales order item D. Internal order
20单选题20 / 95
You create a new profit center. Which company code(s) is it assigned to by default?
查看答案
C. All company codes within the controlling area.
21单选题21 / 95
Which field can you select for both reporting in costing based and account-based ProfitabilityAnalysis?
查看答案
B. Version
22单选题22 / 95
Which statements best describes a single cost center standard hierarchy?
查看答案
D. It is a structure to which all the cost centers within a controlling area are assigned.
23单选题23 / 95
Which statement best describes the Query Browser for reporting?
查看答案
A. It is a desktop browser that integrates with SAP S/4HANA.
24多选题24 / 95
What values flow from Sales and Distribution billing to costing-based Profitability Analysis? Note: There are2 correct answers to this question.
查看答案
A. Cost of goods sold split by cost components D. Value of conditions of pricing procedure
25多选题25 / 95
You want to use budget availability control for your projects and internal orders. What can you check using budget availability control? Note: There are 2 correct answers to this question.
查看答案
B. The availability of funds according to tolerance limits C. The availability of funds in object currency
26多选题26 / 95
You want to maintain a cost component structure. What can you determine for each cost component? Note: There are 3 correct answers to this question.
查看答案
A. Relevance of cost component to inventory valuation D. Relevance of cost component to goods manufactured E. Assignment of cost component of cost component group
27多选题27 / 95
You want to setup integrated planning for your internal order. What do you need to do?Note: There are 2 correct answers to this question.
查看答案
A. Set the relevant indicators in the CO version. D. Set the relevant indicator in the internal order master record.
28多选题28 / 95
Which default values can you configure for the product cost collector? Note: There are 2correct answers to this question.
查看答案
B. Result Analysis (RA) key C. Costing variant for preliminary costing
29单选题29 / 95
You want to run an assessment cycle in Profitability Analysis to allocate cost center costsduring period-end closing for your organization. Which of the following objects is part of theassessment cycle?
查看答案
B. Tracing factor
30单选题30 / 95
You are configuring internal order settlement. What do you define which cost element shouldbe settled, using either the original settlement cost elements?
查看答案
B. Allocation structure
31多选题31 / 95
Why would you use manual cost allocation in Controlling? Note: There are 2 correct answersto this question.(A). To run simple allocations of actual data(B). To run simple allocations of plan data(C). To correct secondary postings(D). To allocate costs using an allocation cycle
查看答案
A. To run simple allocations of actual data C. To correct secondary postings
32多选题32 / 95
Which parameters are controlled by the costing type in a costing variant? Note: There are 2correct answers to this question.
查看答案
A. Save with date key B. Price updates
33单选题33 / 95
You want to create a new standard cost estimate based on the quantity structure of theexisting standard cost estimate. Which object do you use?(A). Costing type(B). Reference variant(C). Transfer control(D). Costing version
查看答案
C. Transfer control
34多选题34 / 95
You want to determine which operations of the routing should be considered in a productcost calculation.How do you do this? Note: There are 2 correct answers to this question.
查看答案
A. By marking the cost indicator in the control key assigned to the operation B. By marking the Relevance to Costing indicator in the operation
35单选题35 / 95
You want to create cost centers for your company. What is the prerequisite to build an organizational structure for overhead cost controlling?
查看答案
C. Standard hierarchy top node
36多选题36 / 95
You are creating new activity type and want to maintain plan prices for a cost center. Whichattribute must you configure in the activity type master record? Note: There are 3 correct answers tothis question.
查看答案
B. Valid cost center categories D. Price indicator E. Activity type category
37多选题37 / 95
What master data objects can you set up using time-based fields? Note: There are 2 correct answers to this question.
查看答案
A. Cost centers C. Activity type
38多选题38 / 95
You create alternative CO versions for your controlling area, in addition to version 0. Whatwould you use additional CO versions for? Note: There are 2 correct answers to this question.
查看答案
B. To store different plan data C. To store data of parallel valuation
39单选题39 / 95
Which type of Profitability Analysis updates the cost of goods sold at the time of delivery?
查看答案
C. Account-based only
40多选题40 / 95
What are some of the characteristics of planning for internal orders? Note: There are 2correct answers to this question.
查看答案
A. You can plan multiple versions. B. You can enter costs and revenues.
41多选题41 / 95
Which of the following statements best describe Product Cost by Order? Note: There are 2correct answers to this question.
查看答案
C. It is used when full cost traceability is needed. D. It is used when controlling by individual production lots or discrete quantities is needed.
42单选题42 / 95
At what level do you create the structure of the operating concern?
查看答案
C. Client level
43单选题43 / 95
In which module do you process profit center allocations in SAP S/4HANA?
查看答案
B. General ledger accounting
44单选题44 / 95
In a standard system delivery, how many free characteristics can be added to an operating concern?
查看答案
A. 0-70
45单选题45 / 95
What does SAP/S4HANA select line-item-based data for costing based Profitability Analysis reports?
查看答案
C. It select actual data from table CE1XXXX and plan data from CE2XXXX.
46多选题46 / 95
How does SAP S/4HANA capture costs? Note: There are 2 correct answers to this question.
查看答案
B. Primary and secondary costs are captured in general ledger accounts. C. All primary and secondary costs are captured by creating them as cost elements.
47多选题47 / 95
How can you define the overhead rate in a costing sheet? Note: There are 2 correct answers to this question.
查看答案
B. As quantity-based surcharge D. As percentage rate
48单选题48 / 95
You want to use template to consider overhead during product costing. How do you assign the template to your material?
查看答案
A. Using an overhead group and an overhead key
49多选题49 / 95
Which of the following objects can be selected in templates for activity-based costing? Note: There are 2 correct answers to this question.
查看答案
A. Cost center/activity type D. Business process
50单选题50 / 95
Which receiver must be allowed in the settlement profile of product cost collector?
查看答案
B. Material
51多选题51 / 95
You want to understand why cost are collected on sales order item level. What do you need to in the configuration? Note: There are 3 correct answers to this question.
查看答案
A. Requirement type B. Requirements class E. Account assignment category
52单选题52 / 95
To which object do you assign a costing sheet?
查看答案
A. Valuation variant
53多选题53 / 95
How does the system derive the requirement type from the material master data? Note:There are 2 correct answers to this question.
查看答案
B. MRP group -> Strategy group -> planning strategy -> requirements type D. Strategy group -> planning strategy -> requirements type
54多选题54 / 95
For which objects can you enter statistical key figures? Note: There are 3 correct answers to this question.
查看答案
A. Cost centers B. Internal orders E. Profit centers
55单选题55 / 95
You would like to allocate primary and secondary costs from a cost center to another cost center. Which allocation method will you use?
查看答案
A. Assessment
56单选题56 / 95
You are setting up costing-based Profitability Analysis for your organization. How do you configure the deferent market segments?
查看答案
D. As characteristics
57多选题57 / 95
You post a billing document for a sales order with sales order controlling. What data flows to Profit Center Accounting? Note: There are 2 correct answers to this question.
查看答案
A. Sales deductions D. Revenues
58单选题58 / 95
How do you define the relationship between an operating concern and a controlling area?
查看答案
C. 0ne-to-many (1:N)
59单选题59 / 95
At which level do you define the valuation method for results analysis?
查看答案
A. Controlling area
60单选题60 / 95
In the Product Cost by Order process, what does the system calculate depending on the order status?
查看答案
B. WIP at actual costs or variances 
61多选题61 / 95
What are some of the unique attributes of an assessment cycle in Controlling? Note: There are 2 correct answers to this question.
查看答案
A. They use a secondary cost element during transfer. C. They transfer primary and secondary costs.
62多选题62 / 95
What are some of the objectives of Profitability Analysis? Note: There are 2 correct answers to this question.
查看答案
A. Provide the company with information on the performance of its market segments. B. Allow the company to determine if the sales force achieved their contribution margin goals.
63单选题63 / 95
You are considering using commitment management with internal orders. What do you needto do in the configuration?
查看答案
A. Activate commitment management in both the controlling area and the order type.
64单选题64 / 95
How does SAP S/4HANA determine if a characteristic value is valid in Profitability Analysis?
查看答案
C. By defining the characteristic value in the check table
65多选题65 / 95
Which of the following steps are part of the procedure to update the standard price of the material? Note: There are 3 correct answers to this question.
查看答案
A. Release the cost estimate. C. Mark the cost estimate. E. Execute the cost estimate
66多选题66 / 95
What can you configure in the settlement profile? Note: There are 2 correct answers to this question.
查看答案
A. Define document management parameters. C. Determine whether settlement is required.
67多选题67 / 95
What can you manage via the account assignment category? Note: There are 2 correct answers to this question.
查看答案
A. Separate sales order stock C. Valuation of separate sales order stock
68单选题68 / 95
You have implemented Product Cost by Sales Oder in conjunction with cost-based POC results analysis in your organization. For a particular sales order item, you have the following: Plan revenue = 3000; Plan costs = 2000Actual revenue = 1200; Actual cost=1000What data does the system calculate during results analysis?
查看答案
C. "Revenue = 1500; Cost of sales = 1000; Capitalized revenue (revenue in excess of billings) = 300"
69单选题69 / 95
In SAP S/4HANA, you have decided to activate only account-based profitability analysis for- your organization. You want to settle costs and revenue of a sales order item to a profit ability segment. What do you need to configure?
查看答案
D. PA transfer structure
70单选题70 / 95
You are setting up costing-based Profitability Analysis for your organization. How do you configure the deferent market segments?
查看答案
D. As characteristics
71多选题71 / 95
You define rules in a status profile and assign the profile to your internal order type. What do you use the status profile for? Note: There are 3 correct answers to this question.
查看答案
A. To define the user status C. To permit or forbid specific transactions E. To set the initial status as Created or Released
72多选题72 / 95
To which object can you settle an internal order using cost elements with cost element category 21 (internal settlement)? Note: There are 3 correct answers to this question.
查看答案
A. Sales order item B. WBS element D. Network
73单选题73 / 95
You want to prevent reporting extreme periodic fluctuations in your P&L statement. Which Management Accounting activity should you choose to help spread irregular expenses throughout the fiscal year?
查看答案
B. Accrual calculation
74多选题74 / 95
Which scenarios can be covered by one single costing run? Note: There are 2 correct answers to this question.
查看答案
A. Inventory cost estimate of all the materials in one plant D. Product cost collector cost estimate in one plant
75单选题75 / 95
For which of the following situations would you need to implement the transfer price  solution in SAP S4/NANA?
查看答案
A. Parallel variation views of the same logistical flows are needed to differentiate between legal and profit center valuation.
76多选题76 / 95
You want to derive the profitability segment for a line item in the universal journal using SAPS/4HANA standard configuration. What requirements must be fulfilled? Note: There are 2 correct answers to this question.
查看答案
B. Account-based Profitability Analysis must be active. D. The type of the general ledger account must be primary cost/revenue or secondary cost.
77多选题77 / 95
Which of the following values can be calculated using result analysis? Note: There are 3correct answers to this question.
查看答案
A. Cost of sales B. Reserves for unrealized costs E. Work in progress
78多选题78 / 95
What parameters can you set up when defining order types? Note: There are 2 correct answers to this question.
查看答案
B. Define default parameters for master record fields. D. Allow revenue postings.
79单选题79 / 95
What can you do with statistical internal orders?
查看答案
C. Simultaneously post to a cost center.
80单选题80 / 95
Which setting in the cost center master data do you use to assign the same attributes to similar cost center?
查看答案
A. Cost center category
81多选题81 / 95
Which of the following statements apply to SAP S/4HANA embedded analytics? Note: There are 2 correct answers to this question.
查看答案
B. It is the core SAP S4/HANA license and users the same technical stack and user interface. C. It uses core data services (CDS ) views to create virtual data models (VDMs ) for reporting.
82单选题82 / 95
You have implemented Product Cost by Sales Oder in conjunction with revenue-based results analysis in your organization. For a particular sales order item, you have the following: Plan revenue = 3000; Plan costs = 2000Actual revenue = 1200; Actual costs = 1000What data does the system calculate during results analysis?
查看答案
D. Revenue = 1200; Cost of sales = 800; WIP = 200
83多选题83 / 95
For which revenue-carrying cost objects does the system perform results analysis? Note: There are 3 correct answers to this question.
查看答案
C. Internal order D. Work breakdown structure E. Customer service orders
84多选题84 / 95
What does the calculation of a condition type in the costing sheet of CO-PA depend on? Note: There are 2 correct answers to this- question.
查看答案
B. Calculation type D. Condition class
85多选题85 / 95
Which controls can you set when you determine a characteristic derivation? Note: There are 3 correct answers to this question.
查看答案
B. System response when unsuccessful D. Overwriting authority E. Conditions for execution
86单选题86 / 95
You post an expense line in an accounting document and enter an internal order and a cost center as the account assignments. After posting, the system allows you to settle the posted values from the internal order. Which settings do the cost center and internal order have? Please choose the correct answer.
查看答案
A. Real internal order Real cost center
87多选题87 / 95
In which SAP S/4HANA components can you report the results of the results analysis? Note: There are 3 correct answers to this question. 
查看答案
A. Profitability analysis C. Profit center accounting E. Financial accounting
88单选题88 / 95
What must the referenced cost estimate and the receiving cost estimate have in common? Please choose the correct answer.
查看答案
C. The quantity structure
89单选题89 / 95
Which object controls the tiles a business user can assign to their SAP Fiori Launchpad ?Please choose the correct answer.
查看答案
D. Tile catalog
90多选题90 / 95
You need to assign a company code to a controlling area. Which settings must be identical for both organizational objects? Note: There are 2 correct answers to this question variant
查看答案
A. Operational Chart of accounts D.  Fiscal year
91多选题91 / 95
Which of the following objects can be selected in templates for activity-based costing? Note: There are 2 correct answers to this question.
查看答案
B. Internal order C. WBS element
92多选题92 / 95
What parameters can you set up when defining order types? Note: There are 2 correct answers to this question.
查看答案
B. Define default parameters for master record fields. D. Allow revenue postings.
93多选题93 / 95
You are setting up cost-based profit ability analysis for your organization. What are related configuration activity Note: There are 3 correct answers to this question.
查看答案
B. Configure cogs split C. Define characteristics D. Assign value fields to conditions
94单选题94 / 95
Your enterprise has five company codes assigned to three separate charts of ac-counts. What's the optimal is between controlling area and operational considerations.
查看答案
B. three controlling area, one operating concern
95单选题95 / 95
When you create a new commitment management. What documents are generated, commitment management against budget
查看答案
A. Purchase requisitions office materials
← 上一卷下一卷 →